Bardale Phase 5 Housing Development

Congratulations to KLS Consulting Engineers for completing the designs for Bardale Phase 5. The project included:
– Design of bulk earthworks platform for a 5.39 Ha site (3200 cut-to-fill).
– Design of 8 road segments and 9 junctions (total length of 870m).
– Design of municipal stormwater (665m), foul water (930m) and water reticulation with connections for the proposed residential units.

“I used Civil Designer to design the bulk earthworks platforms, road networks, storm and sewer reticulations. There were numerous challenges including the site topography and ground water preventing pipes being laid in the initial trench excavations. Civil Designer‘s simple-to-use yet powerful design and analysis tools allowed us to make responsive changes and rapid progress. It is this that helps to set us apart.” Cameron Slinger, KLS Consulting Engineers, South Africa.